The commercial contracting industry operates through a dense layer of specialized terminology that shapes every phase of a project — from site acquisition through final punch list. This glossary defines the core terms used across procurement, contract structure, trade coordination, and project delivery in US commercial construction. Understanding these definitions helps owners, project managers, and procurement officers evaluate proposals, interpret contract documents, and communicate precisely with licensed contractors.

Definition and scope

A commercial contractor is a licensed construction firm engaged to perform building, renovation, or specialty trade work on non-residential or multi-unit residential properties, operating under contracts governed by state licensing law, federal labor standards, and local building codes. This contrasts with residential contractors, who work under different licensing tracks, bonding thresholds, and code classifications in most jurisdictions (commercial-contractor-licensing-requirements-us).

The vocabulary of commercial contracting divides into five functional clusters:

  1. Project delivery terminology — terms describing how design and construction responsibilities are allocated (design-bid-build, design-build, construction management at-risk, integrated project delivery)
  2. Contract structure terms — terms defining payment mechanisms, risk allocation, and scope boundaries (lump sum, GMP, unit price, cost-plus)
  3. Procurement and bidding terms — language governing how contractors are solicited, qualified, and selected (RFP, RFQ, invitation to bid, bid bond, bid leveling)
  4. Financial and lien terms — terms tied to payment flows and legal encumbrances (retainage, progress billing, lien waiver, mechanic's lien, pay-when-paid)
  5. Compliance and credential terms — language covering licensing, insurance, and bonding requirements (COI, additional insured, performance bond, surety, prequalification)

Each cluster is explored in the sections below with definitions, operational context, and classification boundaries.

How it works

Commercial contracting terminology functions as a shared legal and operational language embedded in bid documents, contracts, and specifications. Misreading a single term — such as confusing a not-to-exceed (NTE) contract with a guaranteed maximum price (GMP) — can expose an owner to cost overruns that would otherwise be contractually absorbed by the contractor.

Core term definitions:

Common scenarios

Scenario 1 — Tenant Improvement (TI): A commercial tenant contracts with a GC for interior build-out of leased space. The lease may include a tenant improvement allowance from the landlord, expressed as a dollar-per-square-foot figure (e.g., $60/SF). The contractor works under a lump sum or GMP contract scoped to landlord-approved drawings (commercial-tenant-improvement-contractors).

Scenario 2 — Design-Build Delivery: A single entity holds both design and construction responsibility. The owner contracts with one firm, eliminating the gap between design intent and constructability. This method can compress schedule by 10–20% compared to sequential design-bid-build, according to the Design-Build Institute of America (DBIA).

Scenario 3 — Public Project Bidding: A municipality issues an invitation to bid on a $2 million facility renovation. Contractors submit sealed bids; the contract is typically awarded to the lowest responsive, responsible bidder. Bid bonds — commonly 5–10% of the bid amount — guarantee that the bidder will execute the contract if awarded.

Decision boundaries

GC vs. CM at-risk: When design is less than 50% complete, owners frequently prefer CM at-risk because it allows construction expertise to inform design decisions and permits early trade package bidding. GC procurement through design-bid-build suits projects with complete construction documents and competitive market conditions.

Lump Sum vs. Cost-Plus: Lump sum contracts protect owners from cost escalation when scope is fully defined. Cost-plus contracts are appropriate when fast-track schedules, phased design, or undefined site conditions make a fixed price unreliable. GMP structures represent a negotiated middle position — the contractor assumes overrun risk above the ceiling while the owner retains transparency into actual costs.

Performance Bond vs. No Bond: Private owners below the Miller Act threshold make an independent decision about bonding. Projects exceeding $5 million in contract value, or those with public funding components, carry sufficient default risk to justify the premium — typically 0.5–2% of the contract value depending on the contractor's credit profile and surety market conditions (commercial-contractor-bonding-requirements).

Conditional vs. Unconditional Lien Waivers: Conditional waivers should always precede payment; unconditional waivers should be exchanged only after payment has cleared. Signing an unconditional waiver before receipt of funds eliminates lien rights regardless of whether payment follows.