Commercial Contractors Directory

Commercial Glazing and Curtain Wall Contractors

Commercial glazing and curtain wall contractors specialize in the design, fabrication, and installation of glass-based envelope systems for non-residential buildings — from storefront window walls to multi-story unitized curtain wall facades. This page covers the classification of glazing systems, how these contractors operate within the broader construction process, the project types where they are engaged, and the criteria that define scope boundaries between glazing trades and adjacent specialties. Understanding these distinctions matters for project owners, general contractors, and procurement teams coordinating specialty trade contractors on commercial projects.


Definition and scope

Commercial glazing contractors install and seal glass, aluminum framing systems, and related materials in commercial structures. Their scope encompasses:

The CSI MasterFormat classification places glazing work primarily under Division 08 (Openings), with curtain wall systems coded under Section 08 44 00 and storefront systems under 08 41 13. Structural silicone glazing falls under 08 44 33. These codes shape how bid packages are structured and how subcontract scope is divided on commercial construction projects.


How it works

Glazing and curtain wall contractors enter the construction sequence after the structural frame is complete — or in parallel with upper floors on fast-track schedules — and typically work before commercial roofing contractors complete the building envelope.

Procurement and fabrication represent a large share of the contractor's role. Curtain wall systems are predominantly shop-fabricated; the contractor receives structural and architectural drawings, produces shop drawings for engineer-of-record approval, then coordinates fabrication with aluminum extrusion and glass suppliers. Lead times for unitized curtain wall panels run 14 to 26 weeks on large projects, making early procurement essential.

Installation methods differ between the two dominant curtain wall types:

  1. Stick-built curtain wall: Aluminum mullions (vertical members) and transoms (horizontal members) are installed piece-by-piece in the field. Glass infill panels and gaskets are inserted after the framing is in place. Stick-built systems allow more field adjustment but require more on-site labor hours.
  2. Unitized curtain wall: Pre-assembled panels — each typically one module wide and one floor tall — are crane-lifted and interlocked onto the building structure. Unitized systems transfer more quality control to the factory, reduce on-site labor, and are standard on high-rise projects above 10 stories.

Waterproofing continuity is critical: glazing contractors coordinate with the waterproofing and air barrier trades to ensure that sill flashings, perimeter sealant joints, and drainage channels meet the project's air and water infiltration specifications. Performance targets are tested against ASTM International standards E283 (air infiltration), E330 (structural performance), and E331 (water penetration resistance).


Common scenarios

High-rise office towers are the canonical curtain wall application. The glass-to-wall ratio on Class A office buildings frequently exceeds 60%, making glazing one of the largest envelope subcontracts by dollar value. Projects in this category almost always use unitized systems for schedule efficiency.

Retail and mixed-use ground floors use storefront and window wall systems. These are lower-cost assemblies with shorter lead times, often installed by the same glazing subcontractor who handles upper-floor curtain wall on mixed-use buildings. This is relevant context for retail commercial contractor services.

Healthcare and education facilities present specific glazing requirements: blast-resistant glazing for government-adjacent buildings, impact-resistant laminated glass for hurricane exposure zones, and acoustic laminated glass for classroom and patient room partitions. Healthcare facility contractors routinely spec these performance tiers.

Renovation and re-cladding projects replace aging curtain wall systems on occupied buildings without altering the structural frame. These projects require temporary weather protection sequencing and often involve hazardous material abatement when removing original sealants containing polychlorinated biphenyls (PCBs), a known legacy material in sealants installed before the U.S. EPA's 1979 PCB manufacturing ban (EPA PCB regulations under TSCA Section 6(e)).


Decision boundaries

Defining where glazing contractor scope begins and ends prevents contract gaps and disputes. Key boundary questions include:

Licensing for glazing contractors varies by state. Glazing is classified as a specialty contractor license category in states including California, Florida, and Arizona, each with distinct examination and insurance requirements. The commercial contractor licensing requirements resource covers state-by-state classification in detail.


References

On this site

Core Topics
Contact

In the network