Healthcare Facility Contractor Services

Healthcare facility construction and renovation represents one of the most technically demanding segments of the commercial contracting industry, governed by federal infection control guidelines, state licensing boards, and accreditation standards that apply to no other building type. This page covers the definition and scope of healthcare contractor services, how these projects are structured and executed, the scenarios in which specialized healthcare contractors are engaged, and the decision boundaries that separate general commercial work from regulated healthcare construction.

Definition and scope

Healthcare facility contractor services encompass the planning, construction, renovation, and fit-out of environments where patient care, medical procedures, diagnostic imaging, pharmaceutical storage, or clinical administration occur. The category includes acute care hospitals, ambulatory surgery centers (ASCs), medical office buildings, urgent care clinics, long-term care facilities, behavioral health units, and specialty imaging suites.

What distinguishes healthcare construction from general commercial contractor services is the regulatory overlay. In the United States, the primary technical standard is the Facility Guidelines Institute (FGI) Guidelines for Design and Construction of Hospitals (FGI, 2022 edition), which 42 states have adopted in whole or in part as the enforceable minimum standard for licensed healthcare facilities. Compliance with these guidelines is not optional for facilities seeking accreditation from The Joint Commission or certification under Medicare and Medicaid (CMS Conditions of Participation, 42 CFR Part 482).

The scope of work performed by healthcare contractors spans:

Because healthcare facilities operate 24 hours a day, phased renovation within occupied buildings requires formal Infection Control Risk Assessment (ICRA) documentation, a standard jointly maintained by the Association for the Advancement of Medical Instrumentation (AAMI) and referenced in FGI guidelines.

How it works

Healthcare construction projects typically follow a structured delivery process that begins earlier and involves more stakeholders than standard commercial tenant improvement work.

  1. Pre-construction and programming — A functional program is developed with clinical leadership to define room-by-room requirements, patient flow, and equipment needs. Contractors engaged at this phase provide cost modeling and constructability review.
  2. Regulatory coordination — State health department plan review is required before construction begins. Review cycles routinely take 60–120 days depending on project type and jurisdiction.
  3. Infection Control Risk Assessment (ICRA) — For renovation in or adjacent to occupied areas, the contractor prepares an ICRA matrix categorizing construction activity (Class I–IV) against patient population risk (low, medium, high, highest). ICRA Class III and IV activities require physical containment barriers, negative air pressure units, and HEPA filtration.
  4. Phased construction — Work proceeds in sequence to maintain access to operational departments. Phasing plans are submitted to the facility's infection control officer.
  5. Commissioning and activation — All medical gas systems require verification testing per NFPA 99 (2021 edition). Electrical systems require testing under emergency power scenarios. CMS or state surveyors may conduct a life safety survey before occupancy.

Contractors operating in this space maintain subcontractor networks trained to FGI, NFPA 99, and The Joint Commission's Environment of Care standards. Commercial fire protection contractors on healthcare projects must coordinate with smoke compartment design and healthcare occupancy classifications under NFPA 101.

Common scenarios

Healthcare contractor services are engaged across four primary scenario types:

New ground-up hospital or ambulatory facility — Full-scope construction from site work through activation. A 100,000-square-foot ambulatory surgery center may involve 18–30 months of construction time and require coordination between the general contractor, 12 or more specialty trade subcontractors, and medical equipment planners.

Renovation of occupied clinical space — The most complex scenario. Renovation of an ICU, operating room suite, or emergency department while the facility remains operational requires ICRA Class III or IV protocols, after-hours scheduling of high-dust trades, and daily coordination with the facility's infection control officer. Noise and vibration limits are enforced during patient care hours.

Medical office building tenant improvement — Closer to standard office build-out work but involving medical gas rough-ins, ADA-compliant exam room layouts, and specialized plumbing for clinical sinks. These projects are less regulated than licensed acute care facilities but must still meet state medical board facility standards in states that license medical offices.

Imaging suite installation — Linear accelerator vaults, MRI rooms, and CT suites require radiation shielding designed by a licensed medical physicist. Contractors install concrete shielding barriers, radiofrequency (RF) shielding for MRI, and specialty structural supports for imaging equipment weighing 10,000–30,000 pounds.

Decision boundaries

The threshold between standard commercial construction and regulated healthcare construction is determined by three factors: facility licensure, accreditation requirements, and funding source.

Any facility licensed by a state health department as a hospital, ASC, or skilled nursing facility falls under FGI guidelines (in the 42 adopting states) regardless of project size. A $40,000 renovation of a medication room in a licensed hospital triggers the same ICRA and plan review requirements as a $4 million operating room addition.

In contrast, a medical spa, wellness clinic, or physician's private office that is not licensed as a healthcare facility does not trigger FGI review or NFPA 99 medical gas requirements — those projects follow standard commercial interior fit-out protocols.

Contractors unfamiliar with the distinction between licensed and unlicensed healthcare environments risk scope gaps, failed inspections, and delayed occupancy permits. Verification of a facility's licensure status through the applicable state health department is a prerequisite step in contractor selection and credentialing for any project with clinical space components.

Projects receiving CMS reimbursement through Medicare or Medicaid must additionally comply with the Physical Environment chapter of CMS's Conditions of Participation (42 CFR Part 482.41), which references the 2012 edition of the Life Safety Code (NFPA 101) as the minimum standard for construction and renovation.